Client
Pars National Argo-Industry and animal husbandry Company

Period :
2001 May - 2002 May

Location :
East Azerbaijan, Iran

Type of Project :
PC


Contract Subject: Procurement & Construction of Pars 1 Pump Station and Transmission Pipeline

Scope of Works:

In May 2001 OMRAB was awarded a contract for Procurement, Construction, Installation and Commissioning of Pars 1 pump station and transmission pipeline.

 This project accomplished during 1 year.

Scope of works includes Procurement, Installation, Commissioning and Construction of civil works and 3km water transmission Pipeline (DN: 1400 mm). This Pump station was furnished by 14 multistage high Pressure Pumps with total capacity of 19'000 m3 per day.

Latest News

Signing the Contract with "Jahan Foulad Sirjan" company to suppl "RO water purification" system

supplying the purified water needed in its factories, including smelting and casting plant No. 1 of Jahan Foulad Sirjan factories

Signing the Contract with "Pars Oil and Gas" Company to "provide conceptual and basic design engineering services

In March 1401 Omrab.Co signed a contract to provide conceptual and basic design engineering services for Improvement and upgrade of wastewater treatment units in South Pars gas power plants

implementing industrial water treatment plant and cooling tower systems of Shadegan Steel Complex

Since July 1401, Omrab Engineering Company has signed a contract for engineering, equipment supply, installation and operation of industrial water treatment plant and cooling tower systems with this steel complex

Omrab was elected as the top exporter of Iran in technical and engineering services by Trade Promotion Organization of Iran

In Iran exports each year on National Day of exports the top companies in the field of export of services and goods will be honored by trade promotion organization of Iran.