Date:8/8/2013
/
Visit Count : 1372
Contract Awarding ...
Contract Name: CHITGAR POND WATER TREATMENT PLANT
Contract Type: Design, Build & Operation (DBO)
Designer: APP Consulting Engineers (Omrab's sister company)
Client: Tehran Municipality
Consultant: Toossab Consulting Engineers Company
PMC: Armature Pardis Engineering and Construction Company
Contractor: Omrab Eng. Co. General Contractor
Plant Capacity: 400 l/s supplied from Kan River
Influent Quality:
• TP: 400 mg/l
• TSS: 150 mg/l
• Turbidity: 40 NTU
Effluent Quality:
• TP: 60 mg/l
• TSS: 10 mg/l
• Turbidity: 4 NTU
Treatment process:
• Screening (Fine & Micro screening);
• Combined coagulation, Flocculation, Clarification and Thickening Unit (LHPS);
• Dual Media Filtration;
• Sodium Hypochlorite Disinfection;
• Mechanical Dewatering
With Special Thanks, Mr.Mohebi From APP Consulting Enginers Co.
ViVa