Thursday 21 November 2024
EN FA AR

Building

Haj Omran Building Complex

In June 2011 OMRAB was awarded a contract for the Review of Design and Construction of Haj Omran border Complex. OMRAB In cooperation by its local partner has been executed this project during one year after awarding. This project because of hard and critical situation such as snowy, mountain climate and geographical location was executed under special performing arrangements.

2011 Jun-2012 Jun(Iraq)
Latest News

Signing the Contract with "Jahan Foulad Sirjan" company to suppl "RO water purification" system

supplying the purified water needed in its factories, including smelting and casting plant No. 1 of Jahan Foulad Sirjan factories

Signing the Contract with "Pars Oil and Gas" Company to "provide conceptual and basic design engineering services

In March 1401 Omrab.Co signed a contract to provide conceptual and basic design engineering services for Improvement and upgrade of wastewater treatment units in South Pars gas power plants

implementing industrial water treatment plant and cooling tower systems of Shadegan Steel Complex

Since July 1401, Omrab Engineering Company has signed a contract for engineering, equipment supply, installation and operation of industrial water treatment plant and cooling tower systems with this steel complex

Omrab was elected as the top exporter of Iran in technical and engineering services by Trade Promotion Organization of Iran

In Iran exports each year on National Day of exports the top companies in the field of export of services and goods will be honored by trade promotion organization of Iran.