Client
Ahwaz Water and Waste Water Company
Period :
2009 Nov - 2013 Nov
Location :
Iran
Type of Project :
EPC
In January 2009 OMRAB conclusion a contract for engineering, procurement, construction of Ahwaz city eastern waste water treatment plant. This project accomplished during 3 years.
Scope of woks includes designing and engineering, procurement and installation of mechanical, electrical, instrumentation and control (I&C) equipment and construction of water treatment plant with total capacity of 112,000 Cu.m per day.
The treatment process has been designed base on a conventional treatment system includes biological activated sludge (SBR system), disinfection by gas chlorination system.