Client
Qazvin regional water authority
Period :
2017 Jul - 2020 Jul
Location :
Qazvin Province, Iran
Type of Project :
PC
OMRAB was awarded a contract as a joint venture with Jahad-Nasr-Kerman for Construction of water supply transfer line from Taleqan dam to Qazvin province. Scope of Works includes Procurement and execution of steel pipe water transfer line with all related facilities and buildings as follow:
DN= 1600mm PN=16 bar, total length: 5137m
DN= 1400mm PN= 16 bar, total length: 5028m
DN= 1600mm PN= 25 bar, total length: 22764m
DN= 1400mm PN= 25 bar, total length: 25827m
DN= 1200mm, PN= 25 bar, total length: 5015m
DN= 800mm, PN= 25 bar, total length: 25667m
DN= 700mm, PN= 25 bar, total length: 17000m
DN= 500mm, PN= 25 bar, total length: 9740m
DN= 300mm, PN= 25 bar, total length: 328m
DN= 250mm, PN= 25 bar, total length: 4432m
Procurement, construction and installation of 275 valve rooms of transfer lines
Construction of 2 ground water concrete storage tanks with capacity of 10000 m3 each tanks. Construction of two steel bridges with length of 70 meters for crossing the river.