Aqra Water Supply Project

Aqra Water Supply Project

Client
Ministry of municipality and tourism –Kurdistan Regional Government (KRG)-Iraq

Period :
2014 Nov - 2020 Nov

Location :
Iraq

Type of Project :
EPC


Kurdistan Regional Government, Ministry of Municipality & Tourism, intend to execute the design, supply, and manufacturing of all mechanical, electrical, control and instrumentation also to construct the civil work of a AQRA Water Supply of maximum output capacity of 3,000 m3/h in normal condition. The Water Treatment Plant will be located in Duhok Governorate Aqra District and supply Drinking water to 17 nearby villages.
Aqra water supply project Omrab’s first Design, Built and Operate (DBO) project which is based on FIDIC. The contract consists of water treatment plant, high lift pump station, two booster pump station and the transmission pipeline and network. Aside from design, Omrab is responsible for preliminary assessment and urban study of the project area, topography studies, population projection and capacity requirement assessment.
The Project facility includes:
Intake structure and low lift pumping station
Pre-sedimentation
Flash mixer
Clariflocculator
Rapid gravity sand filters, complete with back-washing facilities,
Sludge collection tank,
Treated water underground reservoirs in two compartments,
Chemical building,
Chlorination building ,
Treated water high lift pumping.
The proposed treatment plant will produce water which complies with the recommendations of the World Health Organization (WHO) drinking water standards. The intake structure adjacent to the river is one of the challenging parts to design in this project due to 50 meter level difference of water and river bank. The hopper bottom pre-sedimentation and the total 48km of 33kv overhead line and fiber-optic telecommunication network are also among the key design features of this project.

Due to Kurdistan Eqlim Situation from June 2014 ( ISIS attack) and client inability for the project payment till now, this project has been continued by minimum speed with Omrab financial funds till March 2020 ( beginning of Coronavirus Pandemic).

 

Note: The period of project was extended  because of budget object from the employer side considering ISIS war in Iraq.!

 

Latest News

Signing the Contract with "Jahan Foulad Sirjan" company to suppl "RO water purification" system

supplying the purified water needed in its factories, including smelting and casting plant No. 1 of Jahan Foulad Sirjan factories

Signing the Contract with "Pars Oil and Gas" Company to "provide conceptual and basic design engineering services

In March 1401 Omrab.Co signed a contract to provide conceptual and basic design engineering services for Improvement and upgrade of wastewater treatment units in South Pars gas power plants

implementing industrial water treatment plant and cooling tower systems of Shadegan Steel Complex

Since July 1401, Omrab Engineering Company has signed a contract for engineering, equipment supply, installation and operation of industrial water treatment plant and cooling tower systems with this steel complex

Omrab was elected as the top exporter of Iran in technical and engineering services by Trade Promotion Organization of Iran

In Iran exports each year on National Day of exports the top companies in the field of export of services and goods will be honored by trade promotion organization of Iran.