Karvan Pump Station Project

Scope of works includes Construction, Installation and Furnishing Pump station by 3 Split case Centrifugal pumps, surge Protection System, Control System, Transformation if Power Supply system. With total capacity of 34'560 m3 per day.

2001 Mar-2003 Apr(Isfahan, Iran)

Kermanshah Water Supply Project

Scope of woks includes Supply, Installation and furnishing pump station by 24 high pressure multistage centrifugal pumps with total capacity of 172'800 (m3/day) with surge protection System, telemetry & Control system.

2001 Feb-2002 Mar(Iran)

Yazd Water Supply Scheme

In March 1999 OMRAB conclusion a contract for engineering, procurement, construction of Yazd city Water Supply Scheme. This project accomplished during 18 months. Scope of woks includes 4xW ...

1999 Nov-2001 Nov( Iran)

Mary Water Supply Scheme

In March 1997 OMRAB conclusion a contract for engineering, procurement, construction of Mary water treatment plant. This project accomplished this project during 9 months. Scope of woks include ...

1997 Oct-1997 Oct(Turkmenistan)

Gordian Pump Station Project

Scope of works includes Construction of Pump Station, Sedimentation Basin, Transmission Pipeline from Pump Station, Electrical & Mechanical utilities of the Station. This pump station was furnished by 18 multistage centrifugal pumps with total capacity of 120,000 m3 per day, surge protection system, telemetry and control system and also the Irrigation Pipeline Network.

1997 Jul-1999 Jul(Azerbaijan, Iran)
Latest News

Signing the Contract with "Jahan Foulad Sirjan" company to suppl "RO water purification" system

supplying the purified water needed in its factories, including smelting and casting plant No. 1 of Jahan Foulad Sirjan factories

Signing the Contract with "Pars Oil and Gas" Company to "provide conceptual and basic design engineering services

In March 1401 Omrab.Co signed a contract to provide conceptual and basic design engineering services for Improvement and upgrade of wastewater treatment units in South Pars gas power plants

implementing industrial water treatment plant and cooling tower systems of Shadegan Steel Complex

Since July 1401, Omrab Engineering Company has signed a contract for engineering, equipment supply, installation and operation of industrial water treatment plant and cooling tower systems with this steel complex

Omrab was elected as the top exporter of Iran in technical and engineering services by Trade Promotion Organization of Iran