Client
Public water corporation (PWC) -Sudan
Period :
2006 Nov - 2009 Nov
Location :
Sudan
Type of Project :
EPC
In August 2006 OMRAB conclusion a contract for engineering, procurement, construction of Atbara city water treatment plant. This project accomplished this project during 30 Months.
Scope of woks includes designing, engineering, procurement and installation of mechanical, electrical, instrumentation and control (I&C) equipment and construction of water treatment plant with total capacity of 50,000 Cu.m per day.
The treatment process has been designed base on a conventional treatment system includes intake pump station unit, flash mixing unit, flocculation and sedimentation unit, gravity sand filter, gas chlorination, chemical, final pump station unit and control system.
In this project most of hydro electromechanical equipment supply from west of Europe well known partners and suppliers such as Endress-Hauser, Siemens, Mouell, Alldos, Ebro (Germany), Pump Iran, Mirab (Iran)