Client
Ministry of Finance and Economic Planning (MOF)
Period :
2013 Jul - 2017 Dec
Location :
Sennar City, Sennar State, The Republic of Sudan
Type of Project :
Engineering Design and Construction of the Plant (Civil Works)
Engineering design and
construction (civil works) of a water treatment plant for the supply of
drinking water to Sennar City, with a total daily capacity of 50,000 m3.
The treatment process is
based on a conventional treatment system which includes; intake pumping station
unit, pre sedimentation basins, flash mixing units, clari-flocculator units,
gravity sand filter building, recovery and sludge collecting tank for flood
season, pre and post gas chlorination disinfection system, chemical dosing
units, exploitation building and final treated pumping station to the City and
PLC-based control and SCADA system for the entire plant.